Supa Safety Shop banner

Phone 0490 703 134

U3 / 24 Mullingar Way

Landsdale WA 6065

Free postage on

orders over

$195.00

that can be posted

Safe Work Method Statement (SWMS) Form Book

Safe Work Method Statement (SWMS) Form Book

$ 79.00 inc GST

Under OSH and WHS legislation, certain work tasks must have an Safe Work Method Statement (SWMS) prepared for them prior to the work commencing. This SWMS book allows for the easy preparation of the SWMS and the later filing of them. 4 pages per SWMS, 25 SWMS per book.

Features:

  • A4 size
  • 4 individual pages per SWMS set
  • 25 sets per book, sequentially numbered
  • Organisation details, process steps / controls / hazard level
  • Risk matrix chart
  • Consultation / Induction / Sign Off
  • Convenient 2 hole punching for easy filing
  • Supplied in resealable plastic pocket

Size:

  • A4

 

Under OSH and WHS legislation, certain work tasks must have an Safe Work Method Statement (SWMS) prepared for them prior to the work commencing. This SWMS book allows for the easy preparation of the SWMS and the later filing of them. 4 pages per SWMS, 25 SWMS per book.

Size:

  • A4

 

Additional information

Weight 0.4 kg
Dimensions 36 × 20 × 2 cm

Reviews

There are no reviews yet.

Be the first to review “Safe Work Method Statement (SWMS) Form Book”

Your email address will not be published. Required fields are marked *

0
0
Your Cart
Your cart is emptyReturn to Shop